Vashishth IAS Academy Ludhiana

Vashishth IAS Academy for IAS/IPS/PCS/UPSC/PPSC Coaching | Visit Our Youtube Channel For Daily Live Classes | Daily Free Live Current Affairs | For Admission Contact Us On Give Numbers:+91-94640-31200

India, US to Jointly Design & Manufacture Nuclear Reactors y Vashishth Academy

The US Department of Energy (DoE) has granted final approval for an American
company to design and build nuclear power plants in India.
📌📌 This follows the India-US Civil Nuclear Agreement (2007), which took nearly
20 years to materialize due to legal and regulatory challenges.
📌📌 India has pushed for local design and manufacturing, a condition now accepted
by the US.
🔹🔹Highlights of the Deal
✔ Regulatory Approval:
• Holtec International, an American company, has been authorized to transfer
Small Modular Reactor (SMR) technology to Indian firms:
o Larsen & Toubro
o Tata Consulting Engineers
o Holtec Asia🔹🔹
Joint SMR Manufacturing:
• India & US will co-produce Small Modular Reactors (SMRs) and all components.
✔ US Condition:
• The jointly-designed nuclear plants cannot be transferred to other entities or countries without prior US consent.
Significance of the Agreement
✔ Diplomatic Achievement:
• Strengthens India-US strategic ties in nuclear energy.
• Provides India with advanced PWR (Pressurized Water Reactor) technology, previously exclusive to government firms.
✔ Competing with China:
• China is expanding its SMR programs, making this deal crucial for India’s position in the Global South.
✔ Boost for Private Sector:
• Indian firms will gain expertise in nuclear reactor design & manufacturing, enhancing technological self-reliance.
🔹🔹What are Small Modular Reactors (SMRs)?
✔ Definition:
• Advanced nuclear reactors with a power capacity of up to 300 MW(e) per unit.
✔ Key Features:
• Small – Much smaller than traditional reactors.
• Modular – Factory-assembled & transportable.
• Efficient – Uses nuclear fission to generate power.

Advantages of SMRs:
• Lower capital costs & faster deployment.
• Smaller footprint – can be installed in remote locations.
• Incremental scalability – expand power generation as needed.
• Enhanced safety & security – better containment & safeguards.
🔹🔹Need for Private Players in India’s Nuclear Sector
✔ India’s Nuclear Power Expansion Goals:
• Current Capacity: 8,180 MW
• Target for 2031-32: 22,480 MW
• Long-term Goal (by 2047): 100 GW
✔ Growing Energy Demand:
• India’s electricity demand is set to increase 4-5 times by 2047.
• Nuclear power can provide stable, base-load energy, complementing renewables.
✔ Climate Targets:
• Reduce emission intensity by 44% (from 2005 levels) by 2030.
• Achieve 50% non-fossil fuel-based power capacity by 2030.
Governance & Policy Developments
✔ NPCIL’s Bharat Small Reactors (BSRs) Initiative:
• NPCIL has invited private players to participate in SMR development.
✔ Regulatory Changes Needed:
• The Atomic Energy Act (1962) currently restricts nuclear power generation to government-owned entities.
• Amendments are required to allow private sector participation.
🔹🔹Pros & Cons of Private Sector in Nuclear Energy
✅Arguments in Favor
✔ Efficiency & Innovation – Private firms bring new technology & cost efficiency.
✔ Increased Investment – Attracts foreign & domestic capital for nuclear projects.
✔ Faster Execution – Private companies speed up project timelines.
✔ Global Expertise – Encourages cutting-edge tech & best practices.
✔ Job Creation – Expands employment in the nuclear industry.
❌Concerns & Challenges
🚨🚨 Safety Risks – Private firms may prioritize profit over strict safety.
🚨🚨 Transparency Issues – Private companies may lack accountability in handling nuclear tech.🚨🚨
National Security Risks – Foreign ownership/control over critical infrastructure is a concern.
🚨🚨 Regulatory Challenges – Ensuring strict oversight & compliance.
🚨🚨 Profit Motive Over Public Interest – Risk of cost-cutting in environmental & worker safety.🔹🔹
Way Forward
✔ Clear Regulatory Framework:
• Establish strict safety, security, and compliance protocols.
✔ Public-Private Partnerships (PPPs):
• Government retains oversight, while private firms handle innovation & investment.
✔ Gradual Implementation:
• Begin with pilot projects to test private sector participation before large-scale expansion.
📌📌 Conclusion
India’s partnership with the US on nuclear technology and SMRs is a game-changer in its energy sector. However, ensuring
strong regulatory oversight and national security safeguards will be critical in integrating private sector expertise while
maintaining public interest and safety.

Facebook
LinkedIn
Scroll to Top